Select your language

敬愛的教職員生,您們好:

有關綜合院館二樓平台暫時封閉管制說明如下:

一、封閉原因
綜合院館二樓平台原配合「8樓露台遮陽板拆除工程」實施封閉管制。
該拆除作業雖已完成,惟經現場勘查,二樓室外地坪已有老化、破損及雨後濕滑等情形,並影響下方113、114教室,造成漏水情事。為維護師生通行安全,避免滑倒、絆倒等風險,目前仍須暫時維持封條、三角錐等封閉管制措施,尚不宜全面開放通行。

二、辦理時程
本區已納入「綜合院館二樓室外地坪防水改善工程案」辦理,將就地坪防水、鋪面材質及排水等問題一併檢討改善。
本案於115年6月24日第一次開標流標,後續將接續辦理招標作業,預計於115年7月上旬辦理第二次開標,並以115年8月上旬進場施工、115年底前完成改善及重新開放為目標。

三、封閉範圍
封閉範圍為綜合院館二樓平台及周邊區域。實際管制範圍以現場封條、三角錐及告示為準,請師生暫勿進入封閉區域,並改由其他安全動線通行。

施工及管制期間造成不便,敬請見諒,並請配合現場管制措施。
如有相關疑問,請洽總務處營繕組楊先生,分機63094。

總務處 敬啟


1. Reason for the Temporary Closure
The second-floor platform in front of the General Building was originally closed to facilitate the 8th-Floor Terrace Sunshade Removal Project. Although the sunshade removal has been completed, a subsequent site inspection revealed that the outdoor flooring has deteriorated and sustained damage. In addition, the surface may become slippery after rainfall, creating potential slip and trip hazards. The deteriorated flooring has also resulted in water leakage affecting Classrooms 113 and 114 located below.

To ensure campus safety and prevent accidents, the platform will remain temporarily closed until the necessary repair and improvement works are completed. Therefore, the area is not yet ready to reopen.

2. Improvement Project Schedule
The platform has been included in the Waterproofing Improvement Project for the Outdoor Flooring on the Second Floor of the General Building, which will improve the waterproofing, flooring, and drainage systems.

The first tender opening on June 24, 2026, was unsuccessful. A second tender opening is scheduled for early July 2026. Subject to successful procurement, construction is expected to begin in early August 2026, with the platform scheduled to reopen by the end of 2026.

3. Closure Area
The closure applies to the second-floor platform in front of the General Building and its adjacent areas. The actual restricted area is marked by caution tape, traffic cones, and on-site signage.

Faculty, staff, and students are kindly requested to refrain from entering the closed area and to use alternative routes during the closure period.